Verification Before Power-On
No. |
Check Item |
Acceptance Criteria |
---|---|---|
1 |
Battery installation |
The installation is correct and reliable. |
2 |
Cables routing |
Cables are routed properly as required by the customer. |
3 |
Cable tie |
Cable ties are evenly distributed and no burr exists. |
4 |
Grounding |
The PE cable is connected correctly, securely, and reliably. |
5 |
Switch |
The DC switch and all switches connected to the battery are OFF. |
6 |
Cable connection |
The AC output power cable, DC input power cable, battery cable, and signal cable are connected correctly, securely, and reliably. |
7 |
Unused terminal and port |
Unused terminals and ports are locked by watertight caps. |
8 |
Installation environment |
The installation space is proper, and the installation environment is clean and tidy. |