NetEngine 8000 F8 Quick Installation Guide

NetEngine 8000 F8 Quick Installation Guide

Published On:2023-11-22
Views:2869
Downloads:2024
Document ID:EDOC1100276791
Description:
NetEngine 8000 F8 Quick Installation Guide
(Note: This quick installation guide can also be used as the Installation Template.)

1 Device Overview 2 Safety Guidelines 3 Site Requirements 4 Cabinet Requirements
W
Observe all safety regulations and precautions The equipmentmust be used indoors. To ensure normal The distance from the card panels with
operations and long service life of the equipment, the installation
To ensure personal and equipment safety, observe all the safety site must meet the following requirements: cables connected to the surface of the
front door must be greater than or equal
precautions on the equipment and in this document. DANGER The equipment must be installed in a clean, dry, and well ventilated
standard equipment room where temperature can be controlled to 120 mm. Otherwise, the number of
WARNING CAUTION and NOTICE items do not cover all the safety within a proper range. The equipment room must be free from cables allowed on the device may be
precautions and are only supplementary to the safety precautions. leaking or dripping water, heavy dew, and humidity. reduced or the front door may be unable
Follow all the safety precautions and instructions provided by Take dustproof measures in the equipment room. Dust will cause to be closed.


electrostatic charges on the chassis and affect connections of metal The cabinet must meet the requirements
Huawei. The safety precautions outlined in this document are H
挂舌Hook connectors and joints. This shortens equipment service life and may for front-to-back airflow, and the front and 挂舌Hook
only requirements of Huawei and do not cover general safety cause failures of the device. rear doors must have a porosity rate of
The installation site must be free from acidic, alkaline, or other
regulations. Huawei is not liable for any consequence that results corrosive gases. more than 55%.
from violation of regulations pertaining to safe operations or To meet the heat dissipation and maintenance requirements, keep a
NetEngine 8000 F8 safety codes pertaining to design, production, and equipment use. clearance of more than 600 mm (23.62 in.) in front of and behind the
device.
Accessories Operator qualifications The temperature and humidity in the installation site must be 600mm x 600mm x 2200mm
within allowed ranges. (See the table below.) (W x D x H)
D
Serial cable Bare crimp terminal ESD wrist strap Quick Installation Guide Only trained and qualified personnel are allowed to install, Item Requirement
operate or maintain the equipment. Familiarize yourself with all
Panel screw Fiber binding tape Cable tie Cable management frame
safety precautions before performing any operation on the Long-term operating temperature [°C(°F)]: The following factors must also be taken into account when you
select a cabinet:
Floating nut Signal cable label Ground Cable Expandable guide rail equipment. 0°C to 45°C (32°F to 113°F) at an altitude of
-60 m to 1800 m (-197 ft. to 5906 ft.) Cables must be routed out symmetrically from the left and right
Tweezers (for inserting and removing optical fifibers)
DANGER NOTE sides of the cabinet.
Do not install or remove the equipment or power cables while power is on. Temperature When the altitude is between 1800 m and If you use AC&HVDC power modules and AC power cables
To ensure equipment and personal safety, ground the equipment before 5000 m, the highest operating temperature delivered from Huawei, ensure that an AC power source is available
NOTE reduces by 1ºC every time the altitude
powering it on. within 3 m (cable distance) away from the power distribution unit
Figures in the document are for reference only and may be different from actual increases by 220 m. (PDU) of the device. If you use DC power modules, determine the
Storage temperature: -40ºC to +70ºC
devices. WARNING distance from the power distribution cabinet to the PDU of the
Use multiple persons to move or lift a chassis and take measures to protect Operating relative device (cable distance) according to site survey results.)
The type and quantity of items in a packing list vary with the product model. humidity 5% RH to 95% RH, noncondensing
personal safety. The cabinet must have sufficient load bearing capacity to support
Check the delivered items against the actual packing list. Storage relative all the devices in it. The minimum load bearing capacity for a single
Laser beams will cause eye damage. Do not look into bores of optical 5% RH to 95% RH, noncondensing
modules or optical fibers without eye protection. humidity chassis is the minimum load bearing capacity for a single chassis is
Operating/Storage 2-fold of device weight.
NOTICE altitude <5000m If multiple chassis are installed in the same cabinet, the distance
Item NetEngine 8000 F8 During equipment transport and installation, prevent the equipment from between every two chassis must meet requirements. If necessary,
colliding with objects like doors, walls, or shelves. use an earthquake-proof cabinet complying with GR63 Zone4 or
Height 575 mm (22.64 in.)13U Cabinet Requirements
Move an unpacked chassis upright. Do not drag it with it lying down. 4 Zone3 standard.
Width x Depth (Main Do not touch unpainted surfaces of the equipment with wet or
442 mm x 482.8 mm The Huawei A66E cabinet is recommended.
Body) (17.40 in. x 19.01 in.) contaminated gloves.
To support the chassis in the cabinet/rack, you can use
Do not open the ESD bags of cards and modules until they are delivered to NOTE
Width x Depth (Main 482.6 mm x 585 mm Huawei expandable guide rails or separately purchased guide
the equipment room. When taking a card out of the ESD bag, do not use
Body+Accessories) (19 in. x 23.03 in.) rails or tray with sufficient load bearing capacity. If an air filter is installed on the rear door, uninstall it.
the connector to support the card's weight because this operation will
The depth of the cabinet or rack where the device is to be For third-party cabinets, the front door must be equipped with an air filter.
Weight without distort the connector and make the pins on the backplane connector bend.
packaging (Empty 44.95 kg (99.1 lb) installed must be at least 600 mm. When a 600 mm deep
Chassis) [kg(lb)] cabinet or rack is used, the front and rear doors must be
single-swing ones.
ESD protection To facilitate power cable routing, the cabinet or rack must Power Distribution Requirements
Rated input voltage (DC): -48 V DC/-60 V DC 5
Before installing, operating, or maintaining the have sufficient vertical space for device installation. The
Input voltage range (DC): –40 V DC to –72 V DC equipment, wear an ESD wrist strap and insert vertical space needs to be greater than or equal to 15U. If the device uses AC or high-voltage DC power supply, the PDU NetEngine 8000 F8
NetEngine 8000 F8 Rated input voltage (AC): 110 V AC/220 V AC, 50 Hz/60 Hz the other end into the ESD jack on the chassis installed in the cabinet must provide a maximum of 16 A of rated
Power Parameter NOTE ( 2nd chassis)
( 2nd chassis) or cabinet. Remove conductive objects like output current on each line. Replace the PDU if this requirement
Input voltage range (AC): 90 V AC to 290 V AC, 45 Hz to 65 Hz The height of the cabinet or rack is the sum of the chassis height,
guide rail jewelry and watches to prevent damages to the cannot be met. guide rail
Rated input voltage (HVDC): 240 V DC equipment and cards caused by electrostatic guide rails, and cabling space. If the device uses DC power supply, the PDU installed in the cabinet
must provide a maximum of 60 A of rated output current on each
Input voltage range (HVDC): 190 V DC to 290 V DC discharge. The cabinet or rack must have reliable ground points for
line. Replace the PDU if this requirement cannot be met.
grounding the device.
The device must be reliably grounded. Circuit breakers with the
It is recommended that the distance from the front mounting
current leakage protection function are not recommended for the
rails to the surface of the front door be 68 mm, 93.5 mm,
devices.
F/L 95mm, or 193 mm. F/L
6 Installing the Chassis
6.1 Open the Installation Template
Floating nuts

NetEngine 8000 F8
Quick Installation Guide
(Note: This quick installation guide can also be used as the Installation Template.)


Hook Hook

S8700
Quick Installation Guide
1 (Note: This quick installation guide can also be used as the Installation Template.)
MARK


NetEngine 8000 F8 NetEngine 8000 F8
guide rail guide rail

F/L F/R 2


NetEngine 8000 F8 NetEngine 8000 F8
mounting hole1 mounting hole5
600


NetEngine 8000 F8 NetEngine 8000 F8
mounting hole2 mounting hole6
NE8000 X4 X8 mounting brackets NE8000 X4 X8
安装孔1 安装孔5


NetEngine 8000 F8
NE8000 X4 X8 NetEngine 8000 F8 NE8000 X4 X8
mounting hole3 mounting hole7
安装孔1 68 安装孔6
F/L F/R


NetEngine 8000 F8 NetEngine 8000 F8
mounting hole4 mounting hole8 57 panel
A= 30
Install expandable guide rails. Adjust the length of the guide rails and place them in marked positions on the
NetEngine 8000 F8 S8700-10 3 68 125
guide rail 滑道安装位置
F/L F/R mounting rails by the plate at the front end and hook at the rear end. The bottom edges of the guide rails must be 95
aligned with scale lines on the mounting rails. Then secure the guide rails with M6 screws. The air baffle of the
1U 1U
guide rails needs to be removed. 193

6.2 Install Floating Nuts and Guide Rails NOTE 6.4 Install the device in the cabinet or rack
When installing an device, reserve a minimum clearance of 2U below the device for subsequent cabling.
Determine the device installation position in the cabinet
1 1U equals 1.75 inch (44.45 mm). U is a unit of height defined in International Electrotechnical
or rack. Two persons hold the installation template, align NOTE
the mounting holes on the installation template with Commission (IEC) 60297.
those on the mounting rails of the cabinet or rack, and The air baffles matching the guide rails will affect power cable routing out of the chassis. To avoid this, If boards and power modules have been installed on
fix the installation template on the mounting rails. Mark air baffles are not required onsite. the device, you are advised to remove them before
the mounting holes for the mounting brackets and installing the router in the cabinet/rack.
expandable guide rails, and then remove the installation
template.
1 Use a pallet truck or lifter to move the device into
NOTE 6.3 Install mounting brackets the cabinet or rack.
Positions of mounting brackets only need to be marked on
the front mounting rails, whereas positions of expandable
NOTICE
guide rails must be marked on both the front and rear Install mounting brackets. Measure the distance (distance A) from the front door to the front mounting tails.
mounting rails. Keep the mounting holes on the front and For the A66E cabinet, distance A is 93.5 mm. In this case, you do not need to adjust the mounting brackets, and can The chassis is heavy, so lifting it manually is not
rear mounting rails on the same horizontal plane. use the long cable management frames that are delivered by default. recommended.
For a third-party cabinet, distance A is 68 mm. In this case, you need to adjust the chassis's mounting brackets 27 If no pallet truck or lifter is available and the
mm closer to the cabinet's front door, and can use the short cable management frames that need to be purchased chassis has to be moved into the cabinet or rack
2 Install floating nuts in the marked mounting holes. separately. manually, move the chassis by the load bearing
For legacy cabinets: handles at both sides of it. Do not lift or drag
the chassis by the handles of any modules in the
NOTE If distance A is 95 mm, you do not need to adjust the mounting brackets, and can use the long cable
NE8000 X4 X8 management frames that are delivered by default. chassis; otherwise, the chassis and modules will NE8000 X4 X8
be damaged. Place the rear bottom of the
安装孔2 When installing the device, eight floating nuts are used to If distance A is 193 mm, you need to replace the mounting brackets with those applicable to cabinets with a 安装孔6
secure the mounting brackets, and 10 floating nuts are middle column. In addition, you can use the long cable management frames that are delivered by default. chassis on the guide rails, and then push the
used to secure the guide rails (two for the front end and chassis horizontally and gently until the
three for the rear end of each guide rail). mounting brackets on the chassis are completely
attached to the front mounting rails.
NetEngineNE8000 X4 8000 X8 F8 NetEngineNE8000 8000 X4 X8 F8
mounting安装孔2 hole1 2 Tighten the panel screws on mounting brackets. mounting安装孔 7hole5
7 Installing Modules
7.1 Slot Description 7.2 Installing Cable Management Frames 27.4 Installing Boards

NOTE 1 Wear an ESD wrist strap or ESD gloves. When wearing an ESD wrist strap, ensure that one end of NOTE
the ESD wrist strap is in close contact with your wrist, and the other end is inserted into the ESD
jack of the cabinet or rack. The procedures for installing the MPU, SRU and LPUT are similar. The difference is that the LPUT board needs
A filler panel must be installed in each empty slot. to be installed using an independent wrenches. This document uses the LPUT board as an example to describe
2 Install cable management frames on the device. Insert the positioning pins of a cable management how to install the board.
frame into mounting holes on the device, slide the cable management frame up and down to fit
the positioning pins in the recess of the mounting holes, and tighten the captive screws on the 1 Take the wrenches delivered with the LPUT, press the latches on the wrenches, and then connect the
cable management frame. Tighten the captive screws with a torque of 0.54 N m. Install the other wrenches to the connectors on both sides of the LPUT. See callouts 1 and 2 in Figure. Rotate the
NOTICE cable management frame in the same way. wrenches of the LPUT 45 degrees outward. With two hands holding both sides of the LPUT, slowly
slide the LPUT into the slot along the guide rails, until the LPUT cannot move forward. See callout 3
Before the installation, ensure that the chassis and modules are free from
in Figure.
water drips.
2 Turn the wrenches towards the panel until the board cannot move forward.
When installing a card, ensure that ejector levers of the card are at the bottom
Use a Phillips screwdriver to tighten the captive screws on both ends of the LPUT panel. See callout
to avoid incorrect card installation. Incorrect card installation will damage the 3
4 in Figure. Tighten the captive screws with a torque of 1.18 N m.
connector at the rear of the card.
When installing a card, gently push the card along the guide rails, and be
careful not to crash the card connector. Distorted card connector will cause
pins on the opposite card connector or backplane connector to bend.
NetEngine 8000 F8 If the connector of a card has collided with the slot or other object, ask NetEngine 8000 F8
Huawei professionals whether the card can still be installed. Installing a card
mounting hole2 with distorted connector will cause damages to the devices. mounting hole6

NE8000 X4 X8 NE8000 X4 X8
安装孔3 安装孔7


Slot Layout of the NetEngine 8000 F8


7.3 Installing Power Modules
NE8000 X4 X8 NE8000 X4 X8
1 (Optional) If the slot where a power module will be installed has a filler panel, remove the filler
安装孔3 panel first. 7.5 Installing a PIC 安装孔8
Grasp the power module handle with one hand and use the other hand to support the bottom of
2 Take a PIC out from the ESD bag and verify that the captive screws on the PIC panel are loosened.
the power module. Slowly push the power module into the slot along the guide rails, until you hear 1
Rotate the ejector levers of the PIC 45 degrees outward. See step 1 in Figure.
a click and the power module cannot move forward.
2 With one hand supporting the PIC bottom and the other hand grasping the PIC panel, slowly slide
the PIC into the slot along the guide rails, until the PIC cannot move forward. See step 2 in Figure.
NOTICE 3 Rotate the ejector levers inward and push them until they cannot move forward. See step 3 in
Figure.
When installing a power module, ensure that the side marked with TOP faces upward.
Cover all the vacant slots with filler panels to ensure good electromagnetic shielding, heat dissipation, and 4 Use a Phillips screwdriver to tighten the captive screws on both ends of the PIC panel. See step 4 in
dustproof performance of the device. Figure. Tighten the captive screws with a torque of 12 kgf·cm.


NE8000 X4 X8 NE8000 X4 X8
安装孔4 08 安装孔8

07


06


05

Remove all modulesCAUTION to reduce chassis
55k weight
g (121 lbs) 建议 before
搬 抬前取出movin
重量。 g or lifting
所有 模块,以减 t
he chass
轻机箱is.


10
Remove all modulesCAUTION to reduce chassis
55 weight
kg (121 建 before mov
lbs) 议 搬 抬前 取出 所 有 模 i
重 量。 ng or liftin
g the chassis

, 以 减 轻 机箱 .


09

NE8000 X4 X8 04 NE8000 X4 X8

滑道安装位置 03 滑道安装位置


02



NetEngine 8000 F8 01 NetEngine 8000 F8
WR 6 WR
mounting hole3 P mounting hole7
F/L F/R

8 Connecting Cables 9 Powering On the Chassis

WARNING Indicator status when the device is
NOTE
Cable connection table Before performing a power-on check, ensure that power working normally
For details about cables and optical modules, see the NetEngine 8000 F8 Hardware Description. switches on the external power supply system and the
router are turned off.
The ground point of a NetEngine 8000 F8 is located at the rear of the chassis and supports a ground No. Item Connect To Remarks Module Indicator Status
cable with a two-hole OT terminal. Chassis Connect the two-hole OT2-16-8 terminal to
Verify that the input voltage is within the operating Power module (red, green) Steady green
1 ground the ground point on the device and connect
Ground cable voltage range for the router.
point the one-hole OT16-6 terminal to the ground
point on the cabinet. Check the indicator status on the boards. MPU RUN(G)/ALM(R)/OFL(Y)
Connect power cables SRU (red, green, yellow)
Select AC power cables based on the types Check the indicator status on other modules. Slow
blinking
AC power port of power sockets used in your equipment LPUT RUN/ALM(red, green, yellow)
NOTICE AC power cable room. For more information, see "AC Power NOTE green
Cable" in the NetEngine 8000 F8 Hardware
Before connecting power cables, ensure that power switches on the external power supply system are For more information about indicators, see the Fan module (red, green, yellow)
Description.
turned off. NetEngine 8000 F8 Hardware Description.
Fully insulate the power terminals and other exposed electrical parts.

Power socket
2
on the DC When a DC PEM is installed on the device, Obtaining Product Documentation and
PWR. use DC power cables.
NetEngineNE8000 X4 8000 X8 F8 10 Technical Support NetEngineNE8000 8000 X4 X8 F8
mounting安装孔4 hole4 DC power cable mounting安装孔 9hole8
For enterprise users:
Connect signal cables For more information, see "High-Voltage DC
AC power port Log in to Huawei enterprise technical support website
High-voltage DC PDU Power Cable” in the NetEngine 8000 F8
(https://support.huawei..com/enterprise), and select a specific product model and
NOTICE PDU power cable Hardware Description.
version to find its documentation.
Cover idle optical ports and optical modules with dust plugs and cover idle optical fibers with dust caps.
ETH This port connects the device to an operation Log in to Huawei enterprise support community
A fiber's bend radius must be at least 20 times larger than the fiber's diameter, and is generally greater
3 management terminal or a network management station. (https://forum.huawei.com/enterprise) and post your questions in the community.
than or equal to 40 mm. Ethernet cable port Huawei Enterprise
Install or remove optical fibers carefully to avoid damages to fiber connectors. Technical Support
If a fiber connector is dirty, use an alcohol swab or a piece of air-laid paper to gently wipe the fiber When the device is powered on for the first For carrier usesrs:
connector in one direction. 4 Console port time, use this port for onsite configuration.
Install dust plugs on idle optical ports. Log in to Huawei carrier technical support website
Console cable (https://support.huawei.com/carrier), and select a specific product model and version


1A 2A to find its documentation.
1B 2B
Log in to carrier enterprise support community (https://forum.huawei.com/carrier)
Select appropriate fibers for optical modules. and post your questions in the community.
5
Optical port For more information, see "Optical Fiber" Huawei Carrier
and "Optical Module" in the Technical Support
NetEngine 8000 F8 Hardware Description.
Optical module + fiber
Cable connection diagram 4
Console cable, Open Source Software Notice
connected to an
operation terminal You can view the open source software notice by running the display copyright command in the user view.
Route cables Supplier’s Declaration of Conformity (SDoC)
3 Unique Identifier: trade name: HUAWEI; product name: Router;
NOTE model number: NetEngine 8000 X series routers
The power cables of each chassis are evenly routed along both sides of the Party issuing Supplier’s Declaration of Conformity
cabinet or rack, and are bundled on each side. Specifically, the power cables of
Ethernet cable, Huawei Technologies Co., Ltd.
different chassis in a cabinet or rack cannot be bundled together.Bundle power
connected to an cables at 250-mm intervals and use cable ties to fix them on the rack. Bantian, Longgang District,
operation terminal Shenzhen, 518129, P.R.C
Power cables and ground cables must be more than 30 mm away from
signal cables. Tel: +86 755 28780808
Responsible Party- U.S. Contact Information
Use cable ties to bundle Ethernet cables and high-speed cables to the rack Huawei Technologies USA Inc.
at 250-mm intervals.
2 5700 Tennyson Parkway, Suite 500 NetEngine 8000 F8
NetEngine 8000 F8 Use binding straps to bundle optical fibers at 250-mm intervals and use cable Plano, Texas 75024 guide rail
guide rail ties to fix them on the rack. Main: 214-919-6000 / TAC Hotline: 877-448-2934
Power cable FCC Compliance Statement ( for products subject to Part 15)
Arrange the fibers neatly and route them along the cable tray.
This device complies with part 15 of the FCC Rules. Operation is subject to the following two
NE8000 X4 X8 conditions: (1) This device may not cause harmful interference, and (2) this device must accept NE8000 X4 X8
安装孔5 1 Ground cable, any interference received, including interference that may cause undesired operation. 安装孔10
connected to
F/L a cabinet F/R
ground point Trademarks and Permissions

and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
NE8000 X4 X8 All other trademarks and trade names mentioned in this document are the property of their respective holders. NE8000 X4 X8
滑道安装位置 滑道安装位置
Copyright © Huawei Technologies Co., Ltd. 2022. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of