No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

The simulator in the OptiX OSN 6800 cannot be used to establish the pre-configuration.

Publication Date:  2012-07-25 Views:  125 Downloads:  0

Issue Description

The OptiX OSN 6800 and OptiX OSN 3800 cannot perform the pre-configurations like other NEs in the T2000. The pre-configuration operations can be implemented by using the Simulator. After the Simulator and T2000 start, an optical NE cannot be created. 

Alarm Information

Error code in the communication port: 98312 

Handling Process

In the creation of the OptiX OSN 6800 NE, the IP of the gateway NE should be set to the IP of the T2000 server. When the IP address of the T2000 server changes, the IP of the OptiX OSN 6800 gateway NE must change. Otherwise, the connection fails. 

Root Cause

For the configurations of the gateway NE IP address of the OptiX OSN 6800, the Simulator has strict requirements. 

Suggestions

None. 

END