No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

In the Case of Client-side 1+1 Protection Involving Multiple Subracks, the External Switching Status May Change if the SCC Is Reset

Publication Date:  2012-07-25 Views:  95 Downloads:  0

Issue Description

In the case of client-sie 1+1 protection involving multiple subracks, the switching status is "manual switch to the protection” before reset of the SCC and may change to IDLE after reset of the SCC. 

Alarm Information

Null 

Handling Process

Clear the external switching status of the protection group before the reset of the SCC board. 

Root Cause

After the reset of the SCC board, the protocol of cross-subrack client-side 1+1 protection restarts as follows:
1. Initialize the status of the working and protection channels to IN_SF, and open the active and standby lasers.
2. The working channel reports the IN_SF event. As the protection channel is still in the IN_SF state, the working channel has a better status than the protection channel. Thus the active laser is enabled and the standby laser is shut down. This performance triggers the status change of control units (the DCP/OLP boards).
3. The protection channel reports the IN_NORMAL event and the working channel is in the same status. So the standby laser is enabled.
After the above process, the former status changes to IDLE. 
 

Suggestions

Null 

END