No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

FAQ-Method Used to Commission an MSTP NE During Deploymen

Publication Date:  2019-06-14 Views:  209 Downloads:  0

Issue Description

Method used to commission an MSTP NE during deployment

Solution

Site commissioning:
1. Connect to a PC.
2. Start the NMS.
3. Log in to an NE.
4. Configure basic NE data.
5. Test the connection of the PDH service interface cables.
6. Test optical interface specifications.
7. Test board protection switching.
8. Check alarms on a single site

System commissioning:
1. Test the actual receive optical power of the optical interface board.
2. Check the connection between the NMS computer and the device.
3. Check optical fiber connections on the SDH network.
4. Query the software version on the entire network.
5. Synchronize the time between the NE and the NMS.
6. Start, stop, and set NE performance monitoring.
7. Configure commissioning services.
8. Test SDH clock protection switching.
9. Test SDH network protection switching.
10. Test the EOS service channel.
11. Test all bit errors.
12. Test orderwire.
13. Check network-wide alarms.
For details, refer to the product documentation.

END