Nessuna risorsa pertinente trovata nella lingua selezionata.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

Configuration Guide - Reliability

S7700 and S9700 V200R011C10

This document describes the configuration of BFD, DLDP, VRRP, SmartLink, CFM, EFM, Y.1731 and MAC swap loopback to ensure reliability on the device.
Rate and give feedback:
Huawei utilizza la traduzione automatica insieme alla revisione umana per tradurre questo documento in diverse lingue, per facilitare la comprensione del contenuto di questo documento. Nota: la traduzione automatica, anche la più avanzata, non può corrispondere alla qualità dei trasduttori professionisti. Huawei non accetta alcuna responsabilità per l'accuratezza della traduzione e raccomanda di fare riferimento al documento inglese (per il quale è stato fornito un collegamento).
Configuring Association Between VRRP and NQA to Monitor the Uplink Status

Configuring Association Between VRRP and NQA to Monitor the Uplink Status

Context

Because VRRP cannot detect faults on the uplink of a VRRP group, services may be interrupted. You can associate a VRRP group with an NQA test instance on the master so that the NQA test instance monitors the uplink status of the master. When the NQA test instance detects a fault on the uplink, it notifies the VRRP group that the priority of the master needs to be decreased. Then an active/standby switchover is triggered immediately. This reduces the impact of the uplink fault on service forwarding.

When the fault is rectified, the original master restores its priority and switches to the master to forward traffic.

NQA technology collects statistics on the delay, jitter, and packet loss ratio. You can configure the percentage of failed NQA test instances and NQA association to trigger an active/standby switchover when the uplink is unstable.

NOTE:
  • A VRRP group can only be associated with an NQA ICMP test instance.

  • The master and backup in the VRRP group must work in preemption mode. It is recommended that the preemption delay be 0 on the backup and non-0 on the master.

Procedure

  1. Create an NQA ICMP test instance. For details, see Configuring an ICMP Test Instance in "NQA Configuration" in the S7700 and S9700 V200R011C10 Configuration Guide - Network Management and Monitoring.
  2. Run system-view

    The system view is displayed.

  3. Run interface interface-type interface-number

    The view of the interface on the master where a VRRP group is configured is displayed.

  4. (Optional) On an Ethernet interface, run undo portswitch

    The interface is switched to Layer 3 mode.

    By default, an Ethernet interface works in Layer 2 mode.

  5. Run vrrp vrid virtual-router-id track nqa admin-name test-name [ reduced value-reduced ]

    Association between VRRP and NQA is configured.

    By default, when the associated NQA test instance becomes failed, the priority of the device decreases by 10.

    NOTE:

    When setting the value by which the priority decreases, ensure that the priority of the backup is higher than the priority of the master. This triggers an active/standby switchover.

Traduzione
Download
Updated: 2019-10-18

N. documento: EDOC1000178318

Visualizzazioni:124607

Download: 81

Average rating:
This Document Applies to these Products
Documenti correlati
Related Version
Share
Precedente Avanti