No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

SUN2000-(3KTL-10KTL) User Manual

This document describes the SUN2000-3KTL-M0, SUN2000-4KTL-M0, SUN2000-5KTL-M0, SUN2000-6KTL-M0, SUN2000-8KTL-M0, SUN2000-10KTL-M0, and SUN2000-12KTL-M0 in terms of their installation, electrical connections, commissioning, maintenance, and troubleshooting. BOM number: 01074467, 01074295, 01074300, 01074301, 01074302, 01074306, 01074311, 01074314, 01074315, 01074316, 01074320
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Setting Dry Contact Scheduling Parameters

Setting Dry Contact Scheduling Parameters

Prerequisites

You have logged in to the app as installer. The initial password is 00000a.

Procedure

  1. Set dry contact scheduling parameters.

    NOTE:

    Set Dry contact scheduling to , and set Active power control and Reactive power control.

    Figure C-1 Setting dry contact scheduling parameters

Download
Updated: 2019-05-31

Document ID: EDOC1100059932

Views: 2689

Downloads: 207

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next