No relevant resource is found in the selected language.

This site uses cookies. By continuing to browse the site you are agreeing to our use of cookies. Read our privacy policy>Search

Reminder

To have a better experience, please upgrade your IE browser.

upgrade

SUN2000-(3KTL-10KTL) User Manual

This document describes the SUN2000-3KTL-M0, SUN2000-4KTL-M0, SUN2000-5KTL-M0, SUN2000-6KTL-M0, SUN2000-8KTL-M0, SUN2000-10KTL-M0, and SUN2000-12KTL-M0 in terms of their installation, electrical connections, commissioning, maintenance, and troubleshooting. BOM number: 01074467, 01074295, 01074300, 01074301, 01074302, 01074306, 01074311, 01074314, 01074315, 01074316, 01074320
Rate and give feedback:
Huawei uses machine translation combined with human proofreading to translate this document to different languages in order to help you better understand the content of this document. Note: Even the most advanced machine translation cannot match the quality of professional translators. Huawei shall not bear any responsibility for translation accuracy and it is recommended that you refer to the English document (a link for which has been provided).
Connecting the Power Grid Scheduling Signal Cable

Connecting the Power Grid Scheduling Signal Cable

Cable Connection

The following figure shows the cable connections between the inverter and the Ripple Control Device.

Figure 5-27 Cable connection

Procedure

  1. Connect the signal cable to the signal cable connector.

    Figure 5-28 Installing the cable

  2. Connect the signal cable to the COM port.

    Figure 5-29 Securing the signal cable connector

Download
Updated: 2019-05-31

Document ID: EDOC1100059932

Views: 2858

Downloads: 217

Average rating:
This Document Applies to these Products
Related Documents
Related Version
Share
Previous Next