SUN2000-(3KTL-10KTL)-M0 User Manual

This document describes the SUN2000-3KTL-M0, SUN2000-4KTL-M0, SUN2000-5KTL-M0, SUN2000-6KTL-M0, SUN2000-8KTL-M0, SUN2000-10KTL-M0, and SUN2000-12KTL-M0 in terms of their installation, electrical connections, commissioning, maintenance, and troubleshooting. BOM number: 01074467, 01074295, 01074300, 01074301, 01074302, 01074306, 01074311, 01074314, 01074315, 01074316, 01074320

Connecting the Power Grid Scheduling Signal Cable

Connecting the Power Grid Scheduling Signal Cable

Cable Connection

The following figure shows the cable connections between the inverter and the Ripple Control Device.

Figure 5-31 Cable connection

Procedure

  1. Connect the signal cable to the signal cable connector.

    Figure 5-32 Installing the cable

  2. Connect the signal cable to the COM port.

    Figure 5-33 Securing the signal cable connector